EXPERIENCES

OLTRE 25 ANNI DI ESPERIENZA

Experience List – Marine Segment

logo-royal-caribbean

MN: Millennium/Summit/Constellation/Infinity

Supervision and Project Management on Scrubber Activities:

  • Installation Manager
  • Project Manager
  • Planning and Purchasing Management
  • Modified ship structure
  • Pipe Line Insulation
  • Built alkaline tank
  • Built zero discharge tank
  • Sandblasted and paint
  • Built and installed scrubber foundations
  • Embarked and installed Scrubber
  • Built and installed machinery foundations
  • Embarked and installed machinery
  • Installed Pipe Line
  • Installed Electrical Panel
  • Installed Electrical Plant
  • Performed commissioning with owner and register company
logo-disney-cruise

MN: Fantasy

Adaptation of plants in compliance with "Safe Return to Port" regulations:

  • Installation Manager
  • Project Manager
  • Planning and Purchasing Management
  • Bilge Pipe Line
  • Ballast Pipe Line
  • Fire Pipe Line
  • Co2 Pipe Line
  • Pipe Line Insulation
  • Survay
  • Bilge system design
  • 3D piping modeling
logo-costa

MN: Mediterranea/Atlantica/Luminosa/Victoria

Energy Saving, Pipe Lines and Extraordinary Maintenance:

  • Installation Manager
  • Planning and Purchasing Management
  • Installed Inverter on ACS
  • Built and installed new piping lines Engine Room
  • Built and installed new piping lines Pax Area
  • Bilge Cleaning
  • Bilge Painting
  • Pipe Line Manufacturing
  • Pipe Line Insulation
  • Ventilation Duct Repair
  • Hull and Deck Repair
  • Electrical Lighting Repair
logo-holland-america

MN: Rotterdam/Voleendam/Veendam/Zaandam/Oosterdam/Zuiderdam/Nieuw Amsterdam

New Construction and Drydock Installation:

  • Installation Manager
  • Planning and Purchasing Management
  • Installed indirect expansion refrigeration plant
  • Installed direct expansion refrigeration plant
  • Performed commissioning with owner and register company
  • Perform repairs on UTA
logo-carnival

MN: Breeze/Magic/Sunshine

New Construction and Drydock Installation:

  • Installation Manager
  • Project Manager
  • Planning and Purchasing Management
  • Installed indirect expansion refrigeration plant
  • Installed direct expansion refrigeration plant
  • Performed commissioning with owner and register company
  • Built and installed new piping lines Engine Room
  • Built and installed new piping lines Pax Area
logo-princess

MN: Regal/Royal

New Construction Installation:

  • Installation Manager
  • Project Manager
  • Planning and Purchasing Management
  • Installed indirect expansion refrigeration plant
  • Installed direct expansion refrigeration plant
  • Performed commissioning with owner and register company

Experience Curriculum – Oil GAS Segment/Industry

logo-belleli

Amerada-Shell

New Construction Off-Shore (Drilling Platform):

  • Installation Manager
  • Project Manager
  • Planning
  • Installed Piping system
  • Performed commissioning with register company
logo-ilva

Blast furnace n.1

Maintenance:

  • Replacing coolant casting ring
  • Project Manager
  • Planning
  • Installed Piping system
  • Performed commissioning with register company
logo-ilva

Conveyor belts

Maintenance:

  • Hydraulic Oil system
  • Replacing rollers
  • Replacing hopper
logo-ilva

Tilting Caps

Other:

  • Contruction and installation
venice
Contattaci

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt